PDL-500 kW Load Bank.
Controlled resistive loading for generator testing, commissioning, maintenance and dependable power-system verification..

Australia Wide Delivery
Expert Support
Technical advice from selection to commissioning.
Serviced & Maintained
Built for Tough Sites
Test with confidence. Verify performance under load.
Controlled resistive loading for generator testing, commissioning, maintenance and dependable power-system verification.
- 0–500 kW resistive load range
- Continuous-duty operation
- Eight switches plus rheostat control
- 415 V rated voltage
- 50 Hz / 60 Hz operation
- Industrial forced-air cooling
- Heavy-duty mobile casters
- Top-mounted lifting eyes

Rated performance
Published resistive-load testing data for the PDL-500 kW.
| Performance item | Rated value |
|---|---|
| Rated load range | 0–500 kW |
| Load type | Resistive |
| Duty | Continuous |
| Load control | Eight switches plus rheostat control |
| Load steps | Eight |
| Rated voltage | 415 V AC |
| Rated frequency | 50 Hz / 60 Hz |
| Rated voltage range | 180–415 V AC |
Values are taken from the supplied Kirbtech PDL-500 specification sheet. Confirm the final fleet configuration, compatible generator connection and safe test procedure with Kirbtech.
Technical specifications
Key machine data.
- Actual run time will vary based on load and operating conditions.
Controlled Load Testing
Apply load progressively from 0 to 500 kW to verify generator capacity under real demand.
Continuous-Duty Design
Continuous operation supports extended commissioning, proving and maintenance test routines.
Precise Load Adjustment
Eight switched steps plus rheostat control help technicians set the required test load accurately.
Efficient Forced Cooling
Built-in industrial fan blowers remove heat from the resistive elements during sustained tests.
Durable Resistive Elements
Metal-sheathed finned elements use high-grade nickel resistance wire for dependable performance.
Portable Site Setup
Heavy-duty casters make the unit easier to position between test locations and generator assets.
Practical Handling
Top lifting eyes support controlled relocation while the terminal block simplifies cable termination.
Generator Protection
Routine load testing can identify issues early and help reduce wet stacking from prolonged light load.